Transport substation, composed of 7 bays set out in a one-and-a-half breaker arrangement for a working voltage of 430 kV and a transport capacity of 2.5 GW. This substation works as both a transport and collector substation since it collects the rated power generated by the TOCOMA dam, composed of ten 216 MW generators.

Tocoma Substation | Venezuela

 

This substation works as both a transport and collector substation since it collects the rated power generated by the TOCOMA dam, composed of ten 216 MW generators.