Monitoring of an Electrical Substation
Canary Islands (Spain)
Project Monitoring of an Electrical Substation
Description Thermal image analysis of the critical elements of an electrical substation and integration of this analysis into the plant’s control system (SCADA).
Location Llanos de la Aldea, Canary Islands (Spain)
Client ENER
Finish date 2019
More info about the project
Due to the nature of their construction and operation, electrical substations can suffer breakdowns, degradations and other problems. When corrective actions are not performed in their due time, hot spots can occur in the connectors and cables may even get cut. The consequences can be catastrophic. In order to solve these problems, TSK implemented a solution named SISTER: a system using fixed thermographic cameras allowing for real-time monitoring and recording of the temperature at critical points.
Projects
Throughout these years we have carried out numerous projects in this activity